Support hotline:
0550-1234567

Common problem

In strict accordance with the map construction, to comply with the design changes "a pen" system

We must give and respect the designer's absolute right to the design of the program, in strict accordance with the map construction, such as the need to change the program, should strictly abide by the change process, to seek the design unit and director of the designer's permission and signature, implementation of program changes Pen "system. The design unit and the designer shall have the right to refuse to seal and sign the completed drawing if they do not strictly follow the construction and fail to comply with the design change procedure. We only adhere to the basic red line, in order to ensure the original design of the drawings from the source to ensure the quality of landscaping works.

So and so and so a companyall rights reserved Copyright 2016 All Right Reserved AnhuiICP123456

Address:A certain city in a certain area of a certain street of a certain street Tel:0550-1234567 Fax:0550-1234567

Total Visits:

 
Oline Service

Hotline

0550-1234567